Norm learns how the seamless, clog-less gutter system for the barn is fabricated and installed. Flooring contractor Patrick Hunt shows Kevin how to install a pre-finished engineered cherry floor throughout the first floor of the house. Tom builds the railing system for the barn stairway, while Richard visits a new product design and testing facility for the plumbing industry. Wine cellar contractor Michael Galvin shows Kevin a 3-D fly-through animation of the future wine cellar. At the end of the day, cabinets for the kitchen, pantry, wet bar, and laundry room arrive on a truck from Pennsylvania.